Last week I was called to help as a P.A. (Production Assistant) otherwise known as the Pathetic Arse that wants to work a 16 hour day for “the experience”. Susan Salts, the 2nd director called me to fill 2 positions for this task. After an exhaustive search, I was able to get Jen Farren to help me organize the daily needs of the Actors, Directors and all the different crews that make up a show. Wow, is all I can say about the pace they must keep up with daily. We were so tired after the 3rd day.

Every one on the set were very nice. It seemed like every one was on the same level but had different jobs to do to make it all happen. It is much like a ballet.

The episode of Smith (filmed in Reno) will air on Sept 19 on Warner Brothers WB.

Smith stars Ray Liota, Simon Baker, Franky G (Itialian Job) and looks like a huge movie production.

Kiley